Reconstruction design for the Kosovo Forces (KFOR) Camp Film City campus buildings and facilities completed
21.07.2016Reconstruction design of the campus buildings and facilities of Kosovo peacekeeping forces (KFOR) in Camp Film City (CFC) –Pristina, Kosovo is completed. Design works also included comparative analysis of different design solutions and construction cost and budget calculation.
In the composition of the design works Amhold also performed complete surveys of the existing buildings and technical facilities, specified the source data and criteria, and then prepared detailed reconstruction design project for the construction works.
Camp Film City (source: Google Maps)
- 03.02.2024 The reconstruction works of the air conditioning systems of the office building of the assembly and production complex of Lindab AS began
- 02.02.2024 The preliminary project of the building and facilities of the production and assembly complex was completed in the municipality of Rae
- 24.01.2024 The construction project for strengthening the load-bearing structures of the residential building was completed due to the risk of the Peter the Great military tunnel collapsing.
- 28.12.2023 The reconstruction work of UNESCAP Bangkok city district security facilities was put into operation
- 15.12.2023 The project for the reconstruction of the technical systems of a 12-story office building was completed
- 02.11.2021 The sketch project of the planned logistics building in Lehmja village has been completed
- 12.07.2021 The project of the logistics building to be built at 32 Savi tn in Pärnu received a building permit
- 11.01.2021 Lindab AS production- and logistics centre, project phases IV, V and VI buildings and facilities ready
- 28.01.2019 Construction Project for reconstruction of security facilities and infra systems of the UNESCAP campus in Bangkok completed
- 28.01.2019 Construction project for the reconstruction of Bagram Airfield facilities completed
Archive