Construction project for the reconstruction of Jalalabad Airfield facilities completed
28.01.2019
In January 2019, an integrated construction project was completed at Amhold Ltd.’s office for the reconstruction and extension of Jalalbad Airfield, Afghanistan. Among other engineering parts of the project , the design included a detailed calculation of the cost of the construction work, a schedule for the organization and timeline of the construction phases, and an analysis of assessment and minimization of possible risks. The design was based on engineering, technical, climatic, geotechnical and seismological surveys and in cooperation with engineering companies of Estonia, Afghanistan, UK, Canada, USA and Turkey in 2017-2019. The reconstruction of the airport is planned for 2019-2021.
- 02.11.2021 The sketch project of the planned logistics building in Lehmja village has been completed
- 12.07.2021 The project of the logistics building to be built at 32 Savi tn in Pärnu received a building permit
- 11.01.2021 Lindab AS production- and logistics centre, project phases IV, V and VI buildings and facilities ready
- 28.01.2019 Construction Project for reconstruction of security facilities and infra systems of the UNESCAP campus in Bangkok completed
- 28.01.2019 Construction project for the reconstruction of Jalalabad Airfield facilities completed
- 28.01.2019 Construction project for the reconstruction of Bagram Airfield facilities completed
- 07.08.2017 Preliminary project ready for Herat military hospital’s security and defence infrastructure
- 06.08.2017 New electrical system design documentation prepared for new wing of Blekinge Hospital in Karlskrona
- 04.08.2017 100% Design project for fuel logistics systems at Kabul International Airport completed
- 03.08.2017 Priśtina CFC campus renovation design project completed in Kosovo